equityworld futures pusat

Rabu, 28 Juli 2021

Guanajuato Silver Draws US$7.5m from OCIM



Guanajuato Silver Draws US$7.5m from OCIM

Funds to be Used for Planned El Cubo Restart

VANCOUVER, BC / ACCESSWIRE / July 28, 2021 / Guanajuato Silver Company Ltd. (the "Company" or "GSilver") (TSXV:GSVR)(OTCQX:GSVRF) announces it has drawn down US$7,500,000 from its loan facility with European based metals trading firm OCIM Group. This non-dilutive financing is designed to strengthen the Company's balance sheet during the refurbishment of the Company's El Cubo mine and mill complex located approximately 11 kilometers east of the city of Guanajuato, in central Mexico.

OCIM Loan Details:
On July 26, 2021the Company issued notice to OCIM to draw down funds from the US$7,500,000 silver and gold loan facility discussed and detailed in GSilver's news releases of Dec. 18, 2020 and June 1, 2021, with funds delivered to the Company on July 27, 2021.

GSilver Chairman and CEO James Anderson stated: "We would like to thank everyone at OCIM for their constant support and consistent flexibility. This funding arrangement has allowed us to access their funds at precisely the time we need them to complete our work on the El Cubo mill and continue necessary mine development in preparation for the commencement of commercial production in Q4 2021."

The OCIM loan facility has an 18-month term, including an initial six-month payment-free grace period, and is then repayable over the following 12 months by the Company delivering a set number of silver and gold ounces based on a discount to the LBMA fix price for silver and gold on July 26, 2021. GSilver estimates that the amount of silver and gold required to repay this loan facility will represent approximately 25% of the projected silver and gold to be produced by GSilver from its operations at the El Cubo mill during the 12-month repayment period of the loan. The loan is secured by, among other things, a general security agreement and pledge over the El Cubo complex in favour of OCIM.

Combined with cash on hand of approximately C$4.1m, these additional funds will give the Company a total of approximately C$13.3m to complete mine and mill development prior to initial cash flow from operations. The Company will use the proceeds from this facility to finance the continued refurbishment of the El Cubo mine and mill complex and for general corporate and working capital purposes.

GSilver CFO Lisa Dea said: "Our financial model anticipates initial concentrate sales in November of this year, as we position the Company to be Mexico's next silver and gold producer. We look forward to ramping up to planned production of 29,000 tonnes per month by mid 2022."

Additional news regarding the Company's progress towards commencement of mining activities is anticipated shortly.

Market Maker:
GSilver announces that it has, subject to acceptance of the TSX Venture Exchange ("TSXV"), retained Red Cloud Securities Inc. ("Red Cloud") to act as trading adviser and provide market-making services to the Company in compliance with TSXV policies and applicable securities legislation.

Red Cloud will trade shares of GSilver on the TSXV for the purposes of maintaining an orderly market and improving the liquidity of the Company's common shares. Red Cloud acts on an arm's length basis and will be paid a fee of $5,000 per month on a month-to month basis, subject to termination by either party with written notice of 30 days. There are no performance factors contained in the agreement between Red Cloud and the Company, and Red Cloud will not receive any shares or options from the Company as compensation for its services.

A similar arrangement with Mackie Research Capital Corp., announced on Dec. 1, 2020 is no longer in effect.

Hernan Dorado Smith, a director of GSilver and a "qualified person" as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects, has approved the scientific and technical information contained in this news release.

About Guanajuato Silver Co. Ltd.:
GSilver is a mining development company engaged in reactivating past producing silver and gold mines near the city of Guanajuato, Mexico. The Company is focused on the refurbishment and swift re-commencement of production from its El Cubo mine and mill and its nearby El Pinguico project, as well as the delineation of additional silver and gold resources through underground and surface drilling. Both projects are located within 11km of the city of Guanajuato, which has an established 480-year mining history.

ON BEHALF OF THE BOARD OF DIRECTORS
"James Anderson"
Chairman and CEO

For further information regarding Guanajuato Silver Co. Ltd, please contact:
James Anderson, Director, +1 (778) 989-5346
Email: james.anderson@GSilver.com

Continue to watch our progress at: www.GSilver.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements
This news release contains certain forward-looking statements and information, which relate to future events or future performance including, but not limited to, the ability of the Company to successfully refurbish the El Cubo mine and mill complex, procure equipment, hire personnel and supply and process sufficient mineralized material and resources from El Cubo and El Pinguico through the mill to successfully begin commercial production of silver and gold in Q4 2021, the estimated date for initial sale of concentrate, the estimated percentage of projected production of silver and gold from El Cubo to repay the OCIM loan and the planned tonnage to be processed at El Cubo by mid 2022; the opportunities for further exploration and development at El Cubo and El Pinguico, the proposed exploration and development programs therefor, the timing and costs thereof and the success related thereto.

Such forward-looking statements and information reflect management's current beliefs and are based on information currently available to and assumptions made by the Company; which assumptions, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include: our mineral resource estimates at El Cubo and El Pinguico and the assumptions upon which they are based, including geotechnical and metallurgical characteristics of rock conforming to sampled results and metallurgical performance; tonnage of mineralized material to be mined and processed; resource grades and recoveries; assumptions and discount rates being appropriately applied to production estimates; success of the Company's combined El Cubo / El Pinguico operation; prices for silver and gold remaining as estimated; currency exchange rates remaining as estimated; availability of funds for the Company's projects; capital, decommissioning and reclamation estimates; prices for energy inputs, labour, materials, supplies and services (including transportation); no labour-related disruptions; no unplanned delays or interruptions in scheduled construction and production; all necessary permits, licenses and regulatory approvals are received in a timely manner; and the ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

Readers are cautioned that such forward-looking statements and information are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results to differ materially from those expected including, but not limited to, market conditions, availability of financing, currency rate fluctuations, actual results of exploration, development and production activities, actual resource grades and recoveries of silver and gold, unanticipated geological or structural formations and characteristics, environmental risks, future prices of gold, silver and other metals, operating risks, accidents, labor issues, equipment or personnel delays, delays in obtaining governmental or regulatory approvals and permits, inadequate insurance, and other risks in the mining industry. There are no assurances that GSilver will be able to successfully re-start the El Cubo mill to process mineralized materials to produce silver and gold in the amounts, grades, recoveries, costs and timetable anticipated. In addition, GSilver's decision to begin processing mineralized material from its above and underground stockpiles at El Pinguico and estimated resources at El Cubo through the El Cubo mill is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and therefore is subject to increased uncertainty and risk of failure, both economically and technically. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability, are considered too speculative geologically to have the economic considerations applied to them, and may be materially affected by environmental, permitting, legal, title, socio-political, marketing, and other relevant issues. There are no assurances that the results of the Company's recently announced preliminary economic assessment and projected production of silver and gold will be realized. There is also uncertainty about the spread of COVID-19 and variants of concern and the impact they will have on the Company's operations, supply chains, ability to access El Pinguico and/or El Cubo or procure equipment, contractors and other personnel on a timely basis or at all and economic activity in general. All the forward-looking statements made in this news release are qualified by these cautionary statements and those in our continuous disclosure filings available on SEDAR at www.sedar.com. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances save as required by law.

Guanajuato Silver Company Ltd.
PH: +1(778) 989-5346 E: info@GSilver.com W: GSilver.com 
CA: Suite 578 - 999 Canada Place, Vancouver B.C. V6C 3E1

MX: Carretera - Guanajuato - Silao km 5.5, Int 4, Col. Marfil CP36250, Guanajuato, Gto., Mexico

SOURCE: Guanajuato Silver Company Ltd.



View source version on accesswire.com:
https://www.accesswire.com/657377/Guanajuato-Silver-Draws-US75m-from-OCIM

Copyright © 2021 Guanajuato Silver Company Ltd., All rights reserved.
You are receiving this email because you opted in via our website.

Our mailing address is:
Guanajuato Silver Company Ltd.
578 – 999 Canada Place
Vancouver, BC V6C 3E1
Canada

Add us to your address book


Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.

Email Marketing Powered by Mailchimp

Kamis, 15 Juli 2021

African Gold Group Confirms Both Oxides and Sulphides To Be Incorporated Into Updated Feasibility Study

View this email in your browser

AFRICAN GOLD GROUP CONFIRMS BOTH OXIDES AND SULPHIDES TO BE INCORPORATED INTO UPDATED FEASIBILITY STUDY 

Toronto, Canada - July 15, 2021 – African Gold Group, Inc. (TSX-V: AGG) ("AGG" or the "Company") is pleased to announce final metallurgical test results from its comprehensive sulphide testwork programme. Results of the testwork programme will be incorporated into an updated definitive feasibility study (DFS). The final phase of the testwork programme was to undertake variability testing to determine the optimal process route of the ore across the extent of the ore body. The Company is continuing its work on updating mineral resource estimates (MRE) and an updated definitive feasibility study to incorporate additional drilling and the sulphide testwork results.

Highlights from the metallurgical testing include:

  • Gravity gold recovery values vary from 40.40% to 73.18% with an 85th percentile of 61.52%. These results indicate that the sulphide ore at Kobada is amenable to gravity recovery.
  • Overall gold dissolution at 93.87% (85th percentile) confirms initial findings that consistent overall gold dissolution of above 90% can be achieved on the sulphide ore.   
  • Cyanide consumption values vary from 0.14 kg/t to 0.46 kg/t with an 85th percentile of 0.34 kg/t, indicating low cyanide consumption of the sulphide ore.
  • Lime consumption values vary from 0.23 kg/t to 0.31 kg/t with an 85th percentile of 0.30 kg/t, confirming low lime consumption of the sulphide ore.

Danny Callow, CEO, African Gold Group states :
"The finalisation of our comprehensive sulphide metallurgical testwork programme, culminating in the variability testwork, shows us that sulphides at the Kobada gold project can be treated through a gravity and CIL process. The process design on gravity and CIL for the oxides as presented in our July 2020 Definitive Feasibility Study is suitable for treating the sulphides as well, and this will allow us to add substantial resources to our overall resource base. The sulphides are free-milling, show excellent recoveries and consume low amounts of lime and cyanide, making this a very efficient operating cost process."
 
"These results will feed into our updated DFS, allowing us to incorporate sulphides into the life of mine plan and we believe will add additional reserve ounces to our economic models. The wider testwork programme has been highly successful and confirms Kobada's excellent potential as a future new mine in Mali. We are looking forward to delivering an updated study in Q3-2021."
 
The comprehensive metallurgical testing program was conducted by Maelgwyn South Africa ("MSA") on composite samples from all defined mineral zones (north, south, and central domains) of the main shear zone. The final stage of this process, the variability testing has proven the consistency of being able to treat the sulphides across the extent of the ore body.


Kobada Sulphides Variability Recovery Testwork Results
Upon completion of recovery optimization testwork on a composite sample, the optimum conditions selected were tested on variability samples to determine if the selected process route and optimum conditions selected are applicable across the entire ore body. Six variability samples were selected from the North, South and Central zones. Table 1-1 below shows samples used to make up the variability samples.

Table 1-1: Variability Sample Selection
 
The selected process route on the oxide ore was gravity followed by cyanidation. Initial scouting testwork on the sulphide ore using the same process route as for the oxides showed gold recovery above 90% with low cyanide and lime consumptions. Therefore, the selected recovery process for the sulphides was gravity followed by intensive cyanidation on the gravity concentrate and cyanidation on the gravity middlings and tails. The following optimum leach conditions were selected for the sulphide ore:

  • Grind: 80%-75µm.
  • Leach process: Carbon in leach (CIL).
  • Cyanide addition – 1kg/t.
  • Lab residence time – 12 to 24 hours.
  • pH – 10.5.
  • Percent solids – 50% w/w.

Table 2-1 shows a summary of the variability recovery results.


Table 2-1: Variability Recovery Summary Results
 
The results indicate the following:

  • Gravity gold recovery vary from 40.40% to 73.18% with an 85th percentile of 61.52%. These results indicate that the Kobada sulphide ore is amenable to gravity recovery.
  • The 85th percentile overall gold dissolution is 93.87% which confirms initial findings that overall gold dissolution above 90% can be achieved on the sulphide ore. The ore leaches well to give tails of 0.03 g/t for low and high grades tested with the exception of North and South 4 samples. Low overall recoveries shown are consistent with low grades tested but tail grades are generally less than 0.03 g/t Au. This ties in with findings from the diagnostic leach test which indicated that 0.02 g/t of the gold is locked in quartz or gangue.
  • Cyanide consumption values vary from 0.14 kg/t to 0.46 kg/t with an 85th percentile of 0.34 kg/t. These results confirm initial findings that the sulphide ore is a low cyanide consumer.
  • Lime consumption values vary from 0.23 kg/t to 0.31 kg/t with an 85th percentile of 0.30 kg/t. These results indicate that the sulphide ore is a low lime consumer.

Definitive Feasibility Update
The Company is well underway to deliver an updated Definitive Feasibility Study in Q3-2021. The comprehensive update will target two key areas, namely inclusion of more than 7,000 m from the most recent drilling programme (see press release as of February 2, 2021) and inclusion of additional sulphides from the most recent metallurgical testwork into the resource and reserves.
 
Progress to date includes the following:

  • Completion of a full suite metallurgical testwork on sulphide ore based upon multiple samples shipped from the site.
  • Preparation and assay of more than 7,000 m of exploration drilling, predominantly focusing on Phase 4 infill drilling results (conversion of high grade inferred resources into measured and indicated category).
  • Update of mineral resource and reserve estimates (in progress).
  • Update of mine optimization, economic indicators, mine scheduling and waste dump designs based on revised life of mine plan.
  • Comminution modelling based upon sulphide testwork.
  • Process plant review and design update to treat oxides and sulphides, including but not limited to:
    • Update of layouts, PFD's and P&ID's
    • Update of Mechanical Equipment List (MEL)
    • Update of single line diagrams and electrical loads
    • Preparation of RFQ's for additional equipment packages
    • Update of SMPP designs and RFQs
    • Full peer review and update on earthworks and civil engineering designs
  • Tailings Storage Facility design update to incorporate additional volume based on envisaged higher tonnages, addition of sulphides and potential for higher throughput.
  • Testwork on samples for TSF (testwork underway).
  • Full CAPEX and OPEX update based upon updated SMPP and MEL and future timing of sulphide circuit as well as latest 2021 pricing.
  • Updated economic model based upon updated economic indicators, consensus and latest production information.
  • Receipt of multiple samples required for ESIA update, which includes but is not limited to:
    • Decommissioning and closure plan
    • Groundwater review
    • Geotechnical testwork
    • Air Quality and Noise Impact Assessment
    • Blasting and Vibration assessment
    • Biodiversity assessment
    • Emergency Preparedness and Response plan

About African Gold Group
African Gold Group is a TSX Venture Exchange (TSX-V: AGG) listed exploration and development company with a focus on building Africa's next mid-tier gold producer. The Company has a highly experienced board and management team with a proven track record in the African mining sector operating mines from development through to production. AGG's principal asset is the Kobada Project in southern Mali, which is in an advanced stage of development having completed the 2020 definitive feasibility study and is targeting gold production of 100,000 oz per annum. As well as the initial Kobada Gold Project, other exploration locations have been identified on the Kobada, Farada and Kobada Est concessions, offering potential for an increase in resource. For more information regarding African Gold Group visit our website at www.africangoldgroup.com.
 
For more information: 
Danny Callow
President and Chief Executive Officer
+(27) 76 411 3803

Danny.Callow@africangoldgroup.com
 
Scott Eldridge
Non-Executive Chairman of the Board
(604) 722-5381

Scott.Eldridge@africangoldgroup.com
 
Daniyal Baizak 
VP Corporate Development
(647) 835-9617

Daniyal.Baizak@africangoldgroup.com
 
Camarco (Financial PR)
Gordon Poole
Nick Hennis
+44 (0) 20 3757 4997

AfricanGoldGroup@camarco.co.uk
 
Cautionary statements
 
This press release contains "forward‑looking information" within the meaning of applicable Canadian securities legislation. Forward‑looking information includes, but is not limited to, statements regarding, processing of sulphide materials, appointment of officers and the grant of incentive stock options. Generally, forward‑looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved".  Forward‑looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of AGG to be materially different from those expressed or implied by such forward‑looking information, including but not limited to: receipt of necessary approvals; general business, economic, competitive, political and social uncertainties; future prices of mineral prices; accidents, labour disputes and shortages and other risks of the mining industry. Although AGG has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward‑looking information. AGG does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
 
NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

     
     
Follow on Twitter
LinkedIn
Follow on Instagram
Our mailing address is:
info@africangoldgroup.com

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.
 

Rabu, 14 Juli 2021

Precipitate Provides Results from Barrick's Drilling at Pueblo Grande Project, Dominican Republic

Precipitate Provides Results from Barrick's Drilling at Pueblo Grande Project, Dominican Republic

Vancouver, B.C. - July 14, 2021 - Precipitate Gold Corp. (the "Company" or "Precipitate") (TSXV: PRG, OTCQB: PREIF) announces Barrick Gold Corporation ("Barrick") has delivered laboratory results for the 10 diamond drill holes (totalling 2,514 metres ("m")) from the Company's 100% owned Pueblo Grande Project, as part of its earn-in agreement whereby Barrick has the right to earn a 70% interest in the Pueblo Grande Project located immediately adjacent to Barrick's Pueblo Viejo gold-silver mine in the Dominican Republic.

The Barrick diamond drilling completed to-date has focused solely on a small part of the Lithocap Zone located immediately west of Barrick's Pueblo Viejo mining operation. Barrick's drilling tested several targets previously contemplated by Precipitate prior to the execution of the earn-in agreement. Laboratory data as reported by Barrick includes the following highlight results: 17.0m @ 0.22 grams per tonne gold (g/t Au) (from 61.5m down hole number 21-05) and 10.2m @ 0.44 g/t Au (from 185.5m down hole number 21-07). All other drill holes reported weak or sub-anomalous gold values.

Barrick has advised the Company that it will continue its exploration work under the terms of the earn-in agreement and shift its exploration work toward other prospective gold and base metal zones located elsewhere within the Pueblo Grande Project, specifically La Lechoza (epithermal replacement or veins) and Tres Bocas (volcanogenic massive sulphide (VMS) Au-Ag-Cu-Zn) where past exploration and drilling identified mineralization within coincidental geological, geophysical and multi-element geochemical anomalies hosting elevated gold, silver, zinc and copper values. Historical highlight results for these two zones include the following:

La Lechoza and Tres Bocas Zones Select historical highlight drill intercepts.

Metres
(m)
Gold
(g/t)
Silver
(g/t)
Zinc
(%)
Zone Everton Resources
News Source
10.6 2.96 104.9 9.4 Tres Bocas May 17/2006 (DDH TBM-07)
23.4 4.76 23.0   La Lechoza Jan 27/2011  (DDH APV-30)
27.0 2.46 26.7   La Lechoza Feb 02/2011 (DDH APV11-02)
7.5 2.56 47.2 4.4 La Lechoza Dec 20/2010 (DDH APV10-13)
10.5 2.29 65.0 3.4 La Lechoza Apr 13/2011 (DDH APV11-30)

All above noted intercepts commence at less than 20m drill depth and are drill intercept widths.  The true thickness of the zones has yet to be determined.

Jeffrey Wilson, Precipitate's President and CEO stated, "Although results from Barrick's first phase of drilling did not return significant mineralization, this initial phase of work only focused on a small fraction of the Ponton project, immediately west of Barrick's mining pits. Barrick's continued exploration within additional areas of the project speaks to Ponton's prospectivity and ongoing exploration potential. We're pleased to see Barrick furthering its exploration efforts toward zones where significant near-surface gold and silver mineralization have been reported in historic drill assays."

Ongoing Barrick exploration results will be reported as they become available to Precipitate.

See accompanying map for location of priority zones:

Precipitate's Ponton Project Map depicting multiple mineralized zones and area of Barrick's initial drilling.

2021 drill program core samples were collected under the supervision of Barrick Senior staff. HQ, and NTW diameter diamond core was descriptively logged on site, aligned, marked for sampling and then cut in half, longitudinally, using a rock saw. One-half of the core is preserved in core boxes for verification and future reference. Rock samples were bagged, sealed and delivered directly to Bureau Veritas ("BV") preparation facility in Maimon Dominican Republic where they were dried, crushed and pulped. Sample pulps were then delivered to BV facilities in Vancouver British Columbia Canada for analyses (an ISO 9001 accredited facility). Samples were crushed to with more than 70% passing 2mm mesh and split using a riffle splitter (code PRP70-250). An approximately 250 gram sub-sample split was pulverized to minus 200 mesh (74μm). A 50 gram pulp sub-spilt subjected to fire assay for gold (ICP-ES finish) (code FA450-Au). All coarse rejects and pulps are currently stored at BV. Certified standards and local limestone blanks were inserted into sample shipments as a quality control measure in addition to the internal quality control measures applied by the laboratory.

This news release has been reviewed by Michael Moore, Vice President, Exploration of Precipitate Gold Corporation, the Qualified Person for the technical information in this news release under NI 43-101 standards.

About Precipitate Gold:

Precipitate Gold Corp. is a mineral exploration company focused on exploring and advancing its mineral property interests in the Pueblo Viejo Mining Camp and Tireo Gold Trend of the Dominican Republic. The Company is exploring its 100% owned Ponton and Juan de Herrera projects. The Company has entered into an Earn-In Agreement with Barrick Gold Corporation, whereby Barrick can earn a 70% interest in the Company's Pueblo Grande Project by incurring US$10M within six years and producing a qualifying Pre-feasibility Study. Precipitate is also actively evaluating additional high-impact property acquisitions with the potential to expand the Company's portfolio and increase shareholder value, in the Dominican Republic and other favourable jurisdictions.

Additional information can be viewed at the Company's website www.precipitategold.com.

On Behalf of the Board of Directors of Precipitate Gold Corp.,

"Jeffrey Wilson"
President & CEO

For further information, please contact:
Tel: 604-558-0335     Toll Free: 855-558-0335     investor@precipitategold.com

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release may contain "forward-looking information" within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "proposed", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-looking information reflects Precipitate Gold Corp.'s ("Precipitate" or the "Company") current beliefs and is based on information currently available to Company and on assumptions it believes are reasonable. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Precipitate to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the exploration concessions may not be granted on terms acceptable to the Company, or at all; general business, economic, competitive, political and social uncertainties; the concessions acquired by the Company may not have attributes similar to those of surrounding properties; delay or failure to receive governmental or regulatory approvals; changes in legislation, including environmental legislation affecting mining; timing and availability of external financing on acceptable terms; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. Although Precipitate has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. Precipitate does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Copyright © 2021 Precipitate Gold Corp., All rights reserved.
You are receiving this email because you subscribed for updates via our website.

Our mailing address is:
Precipitate Gold Corp.
625 Howe Street, Suite 1020
Vancouver, BC V6C 2T6
Canada

Add us to your address book


Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list

Email Marketing Powered by Mailchimp






This email was sent to sgbsura1.weqeqe@blogger.com
why did I get this?    unsubscribe from this list    update subscription preferences
Precipitate Gold Corp. · 625 Howe Street, Suite 1020 · Vancouver, BC V6C 2T6 · Canada